Posts tagged Liquigel
Pipeline Surveillance

As a result of paraffin deposition, a GoM operator experienced increased differential pressures in a bulk crude sales pipeline. Historical line maintenance followed normal production chemical treatment. Once pipeline differential pressures reached an alarming level, it was proven that conventional chemical treatment recommendations failed to protect the pipeline or mitigate the ongoing issue. In addition to increasing differential pipeline pressure, depositional shearing became a valid concern and threat to total pipeline plug off.

Read More