Project Experiences & Successes
30-Inch Integrity Assessment
A major midstream gas transmission company required Stress Corrosion Cracking (SCC) integrity assessment services to remain compliant with regulatory specifications. The pipeline was installed in the 1970s and was located in an environmentally sensitive area with high stakeholder interest and visibility. Further increasing project sensitivity, the pipeline owner expected multiple ruptures during the hydrostatic pressure tests phase. In order to compensate for this risk, an extensive outage period was scheduled and communicated to all customers.
eelReel - 6-Inch X 17,000 FT
A GoM upstream operator experienced problematic pressure differentials. Over a period of time this resulted in heavy paraffin deposition and ultimately caused several pigs to become stuck in the 6” flowline. Upon an evaluation of available remediation methods, an extended reach mechanical solution was selected to remove the lodged pigs and properly remediate the paraffin deposition.
Pipeline Evacuation & Assessment
A GoM operator witnessed a leaking 6” pipeline. Upon repairing the visual leak and attempting to perform a successful hydrostatic pressure test a second non-visual leak occurred, ultimately resulting in extended production loss.
In order to perform a second assessment and bring production back online, the pipeline assessment required a 100% fluidpacked volume of seawater to ensure an oxygen-free environment.
36-Inch Integrity Assessment
A major midstream gas company required a Stress Corrosion Cracking (SCC) integrity assessment in order to remain federally compliant. The project schedule was of critical importance due to the customer’s demand date for product transmission. This schedule demanded that BlueFin couple engineering subject matter experts and management resources to deliver a work plan that would meet the customer’s deadline.
SafeHeat Flow Assurance
SafeHeat® technology, custom thermal fluids, and flow assurance engineering provide total approach for plugged GoM pipeline.
8-Inch Reinstatement
Technical expertise and responsive management provide GoM operator with a successful offshore gas pipeline reinstatement.
Barge Pre-Commissioning
Integrated mechanical and pipeline services provide bundled solutions for independent GoM operator.
Gas Storage Pipelines
Qualified personnel and responsive management provide gas storage company with multiple SIM OPS pipeline pre-commissioning scopes of work.
Desired End-Preparation
Split frame lathe technology delivers field machining solutions for one Supermajor in the Dragon Field block.
16-Inch Pre-Commissioning
Qualified personnel and responsive engineering provide midstream company with successful onshore pipeline reclassification and upgrade status.
Pipeline Decommissioning
LiquiGell® pigs and de-oiling chemistry provide economic solution for multi-phase Gulf of Mexico pipeline decommissioning campaign.
Gas Storage
A large North American midstream company operating a gas storage facility required connection integrity management for a planned casing reroute. Due to damaged casing as a result of salt fall within the cavern, the said operator required a large Snubbing stack installation to handle the cavern pressure and capable of cutting 10 3/4” casing.
Slipline® - Pipeline Remediation Solution In LA Wetlands
A Louisiana operator experienced integrity issues with an existing 3 inch saltwater disposal pipeline. Production history recorded multiple leaks in the existing pipe, which resulted in environmental remediation. Upon investigation the operator determined that the said discharge pipe was unsuitable for future use. BlueFin was sought to review the situation and develop a plan of action that would resolve the integrity issues.
6-Inch Re-Assessment
A midstream company operating a high pressure gas pipeline required assessment services in order to maintain regulatory compliance. The said pipeline asset was considered unpiggable for ILI technology. In order to comply with regulatory guidelines for an MAOP verification, the company demanded a hydrostatic pressure test assessment.
Deepwater Flowline Dewater/Dry with High Pressure Nitrogen
An established operator in the Gulf of Mexico, through their preferred contractor, requested BlueFin to perform the dewatering of the flowlines for their two new tiebacks to an existing deepwater facility.
Pneumatic Pressure Test On Air Cooled Condenser (ACC) System
BlueFin Model A manifold systems are designed for high pressure, multiple line flushing and pressure testing.
Paraffin & Hydrate Remediation via eelReel
BlueFin Model A manifold systems are designed for high pressure, multiple line flushing and pressure testing.
Permian Operator Receives Integrated Expertise For Gathering System Commissioning
Planning and project management across a single source provide bundled solutions that deliver cost effective and schedule sensitive services for three separate Central Gathering Facilities (CGF’s) on an expedited timeline for first oil.
Hydrate Remediation
A Gulf of Mexico (GoM) operator in the process of decommissioning one of its fields requested the engineering assessment of a blockage existing in their flowline-riser. The reservoir fluid characteristics and the field’s operational history were extensively reviewed. The review indicated hydrates to be the likely cause of the blockage.
Paraffin Remediation
Custom solvent products and flow assurance engineering provide total approach to plugged GoM pipeline.