SPE 147552 - Integrated Field Optimization Strategy Applied to an Offshore Water Injection Project

Some of the most significant challenges faced with respect to the management of offshore water injection projects are associated with maintaining injectivity into the reservoir and with handling H2S produced due to reservoir souring. This paper presents the process followed and findings generated by a comprehensive review of a mature water injection project performed with the goal of delivering a coordinated operating strategy that would maximize the life of field revenues associated with water injection.

Read More >>