Injection of Flue Gases Study


Led study for independent oil and gas operator regarding the injection of flue gases from Gulf coast power plants to a Deepwater development for the purposes of enhanced oil recovery (EOR). This considered pretreatment and processing requirements for flue gases from natural gas-fired boiler plants, natural gas combined cycle plants, coal-fired boiler plants and integrated gasification combined cycle plants. Key issues considered were the ability of the pretreatment system to remove oxygen and water.

Previous
Previous

Cost-Effective Gas Compression System Expansion Study

Next
Next

Water-Based Gel Pig Restores Flowrates in New Mexico