Noble Energy - Aseng FPSO Asset Modeling


GATE was responsible for the flow assurance modeling to support Detailed Engineering, Final Commissioning and Startup and Operations Readiness for the Aseng Development. This included steady-state and transient modeling of the production, gas injection, and water injection systems.

The modeling encompassed all areas of the system and included topics such as cooldown assessments, blowdown modeling, flowline heating operations, cold-earth start-ups, service line operations via trees and manifolds, gas injection well flowback modeling, water injection surge analysis, water injection virtual metering, injection well injectivity modeling, wellbore cooldown analysis, and others.

Previous
Previous

BP - Mardi Gras Steady State & Transient Modeling

Next
Next

Tullow - Jubilee Remediation of Hydrate Plugs