Project Experiences & Successes

BlueFin Case Study GATE Energy BlueFin Case Study GATE Energy

6”x18,000’ Cleanout via eelReel®

An Independent E&P Company operator’s main 6” infield flowlines on the Gulf of Mexico shelf had been experiencing problematic organic deposition, ultimately rendering it inoperable. The production was re-routed through a parallel 4” line that allowed for production to sustain while the paraffin-stricken line was temporarily abandoned.

Read More
BlueFin Case Study GATE Energy BlueFin Case Study GATE Energy

eelReel Blockage Remediation For GOM Deepwater Flowline Decommissioning

A GoM operator of a 6-inch subsea oil production flowline experienced severe paraffin blockage. The said deposition prevented a successful hydrocarbon de-inventory procedure in order to properly abandon the asset per compliance regulations. Due to insufficient pump rates, the operator faced expensive, complex subsea intervention tasks based upon routine flow assurance methods typically applied in decommissioning scopes of work.

Read More
BlueFin Case Study GATE Energy BlueFin Case Study GATE Energy

eelReel Deepwater Riser Blockage Remediation On TLP

An operator of a mini-TLP experienced flow assurance problems in a subsea oil production flowline system. Operator knowledge and production history identified the issue as a paraffin blockage. Unsure of the blockage location and remediation method, several failed attempts at pressure cycling from the subsea and platform sides resulted in a mechanical remediation need.

Read More
BlueFin Case Study GATE Energy BlueFin Case Study GATE Energy

eelReel Unplugs 100% Paraffin Deposition

A GoM operator experienced problematic pressure differentials over a period of time, ultimately resulting in a completely plugged 6” flowline. Heavy paraffin solids completely plugged the flowline and prevented the transportation of liquid product. Upon an evaluation of available remediation methods, an extended reach mechanical solution was selected.

Read More
BlueFin Case Study GATE Energy BlueFin Case Study GATE Energy

eelReel - 6-Inch X 17,000 FT

A GoM upstream operator experienced problematic pressure differentials. Over a period of time this resulted in heavy paraffin deposition and ultimately caused several pigs to become stuck in the 6” flowline. Upon an evaluation of available remediation methods, an extended reach mechanical solution was selected to remove the lodged pigs and properly remediate the paraffin deposition.

Read More