Project Experiences & Successes

BlueFin Case Study GATE Energy BlueFin Case Study GATE Energy

eelReel Blockage Remediation For GOM Deepwater Flowline Decommissioning

A GoM operator of a 6-inch subsea oil production flowline experienced severe paraffin blockage. The said deposition prevented a successful hydrocarbon de-inventory procedure in order to properly abandon the asset per compliance regulations. Due to insufficient pump rates, the operator faced expensive, complex subsea intervention tasks based upon routine flow assurance methods typically applied in decommissioning scopes of work.

Read More
BlueFin Case Study GATE Energy BlueFin Case Study GATE Energy

Offshore Pipeline Abandonment Requires Bundled Services

A major midstream operator required decommissioning solutions for an aged gas pipeline asset. In order to properly abandon the said infrastructure in compliance with BSEE and state regulatory departments, engineering managers determined that an inert gas medium would mitigate several risks. As important, the asset contained a large amount of residual liquid product that required safe capture and disposal.

Read More