Millwright Services: Rotating Equipment
Solutions
Precision Laser Alignments
Precision Leveling
Equipment Maintenance and Repairs
Equipment Preservation
New Construction
NCCER Certified Plus Millwrights
Applications
Pumps and Gear Boxes
Compressors and Turbines
Mixers, Fans and Dryers
Conveyors and Bucket Elevators
Rotating Equipment
Industries We Service
Refineries
Food
Pharmaceutical
Tire Plants
Petrochemical Plants
Chemical Plants
LNG
Fertilizer
Renewable Energy
Alternative Energy
Consult a Specialist
District Manager | Industrial Services
Mr. Lopez possesses a twenty-one-year tenure in the fabrication and oilfield services industry, complemented by three years of machine shop experience. His journey includes fourteen years at BlueFin.
Phone: 337.551.6975
Resources
Expertise in controlled bolting allows measurement and monitoring vital for joint integrity
Project Experiences & Case Studies
GATE Energy provided full commissioning and start-up services for facility offshore Gulf of Mexico. Yard commissioning work completed in South Korea.
GATE Energy provided full commissioning and start-up services for facility offshore Gulf of Mexico. Work performed in Singapore and US. Full commissioning services including systems completion utilizing Omega PIMs. Yard phase commissioning in Singapore.
GATE Energy was responsible for pre-commissioning, commissioning, regulatory testing and vendor management for all Topsides systems of the King’s Quay FPU, both in South Korea and the United States / Gulf of Mexico. Viking, the engineering arm of GATE Energy, was contracted to assist with the development of the topsides standard operating procedures (SOPs).
GATE Energy provided umbilical commissioning planning and execution for subsea tieback to Bullwinkle facility offshore Gulf of Mexico.
GATE Energy provided full commissioning and start-up services offshore Israel. Due to various project engineering and construction delays on the Noble Energy Leviathan project, GATE was tasked with compressing seven months of onshore commissioning into only three months. GATE was able to quickly increase resources and personnel to mitigate a schedule impact and Leviathan topside left the fabrication yard one hundred percent commissioning complete for onshore scope. This greatly reduced the amount of potential offshore carry-over work and facilitated a successful offshore campaign to deliver the facility for initial start-up on time.
GATE Energy provided full commissioning and start-up services for subsea tieback offshore Gulf of Mexico. Provided subsea systems completion and umbilical commissioning planning services for subsea tieback offshore.
GATE Energy provided full commissioning and start-up services for subsea tieback offshore Gulf of Mexico.
GATE Energy provided full commissioning and start-up services offshore Gulf of Mexico. GATE provided full systems completion and commissioning services and played a key role in safely delivering the Delta House FPS and achieving first oil just three years after discovery was made by LLOG Exploration.
GATE Energy provided full commissioning and start-up services for tieback to Tarantula facility in Gulf of Mexico. Provided umbilical commissioning planning and execution for subsea tieback to Tarantula facility offshore.
Commissioning provided offshore commissioning and start-up support for subsea tieback offshore Gulf of Mexico.
GATE Energy provided commissioning services for control system hardware replacement on Constitution facility offshore Gulf of Mexico.
GATE Energy provided full commissioning and start-up services for tieback to Lucius facility offshore Gulf of Mexico. Provided umbilical commissioning planning and execution for subsea tieback to Lucius.
GATE Energy provided full commissioning and start-up services for first ever Amine Unit on a floating facility offshore Gulf of Mexico
GATE Energy provided turnkey full commissioning, systems completion and start-up services for facility offshore GoM. Provided umbilical commissioning planning and execution for facility offshore Gulf of Mexico.
GATE partnered with Anadarko to execute full systems completion and commissioning services on the Lucius and Heidelberg Spars. Anadarko employed a “design one, build two” philosophy in development of these new-build, greenfield facilities. Though the Lucius project was a success in its own right, the extensive implementation of project lessons learned and carry-over of personnel led to GATE safely and successfully delivering the Heidelberg project three months ahead of schedule and significantly under budget.
GATE Energy provided full commissioning and start-up services offshore Gulf of Mexico. Provided umbilical commissioning planning and execution for facility offshore Gulf of Mexico.
GATE partnered with Anadarko to execute full systems completion and commissioning services on the Lucius and Heidelberg Spars. Anadarko employed a “design one, build two” philosophy in development of these new-build, greenfield facilities. Though the Lucius project was a success in its own right, the extensive implementation of project lessons learned and carry-over of personnel led to GATE safely and successfully delivering the Heidelberg project three months ahead of schedule and significantly under budget.
GATE Energy provided full commissioning and start-up services for a POB expansion project followed by subsea tieback to Lucius facility in Gulf of Mexico. Provided umbilical commissioning planning and execution for subsea tieback to Lucius.
GATE Energy provided full commissioning and start-up services for tieback to Constitution facility in Gulf of Mexico. Provided umbilical commissioning planning and execution for tieback to Constitution facility in Gulf of Mexico
GATE Energy provided full commissioning and start-up services for tieback to Marlin facility in Gulf of Mexico. Provided umbilical commissioning planning and execution for tieback to Marlin facility in Gulf of Mexico.
GATE Energy provided (full commissioning services for addition of gas lift to Horn Mountain facility offshore Gulf of Mexico.
GATE Energy provided full commissioning services for addition of gas lift to Marlin facility offshore Gulf of Mexico.
GATE Energy provided commissioning management and start-up support for facility offshore Equatorial Guinea.
GATE Energy provided client commissioning oversight and start-up support for FPSO project offshore Ghana. Also provided client subsea commissioning oversight and start-up support for FPSO.
GATE Energy provided client commissioning oversight and start-up support for FPSO project offshore Ghana.
GATE Energy served Anadarko project team as Commissioning Technical Lead responsible for developing commissioning philosophies and influencing field design during Pre-FEED and FEED project stages.
GATE Energy provided full commissioning and start-up services for subsea tieback offshore Gulf of Mexico.
GATE Energy provided systems completion and commissioning execution services provided for onshore gas loading terminal near Haifa, Israel. Planning and Systems Completion efforts primarily located in Houston, TX with regular trips to Israel.
BlueFin maintains the mechanical assets required for the majority of operator’s filtration needs. From offshore pipeline abandonments and produced overboard water compliance, to onshore hydrotest water treatment and fluid handling, our team understands the full lifecycle approach to these scopes.
We provide precision alignment and leveling that assures the operator’s critical component downtime and unnecessary wear is minimized and that unwarranted risks are mitigated.
BlueFin’s tenure and expertise in controlled bolting and joint integrity measures and monitors bolt relaxation, gasket creep, direct load loss, friction variable reduction, and direct axial force.
For cases where safe and complete omission from flames are essential, cold cutting applications deliver safe, reliable results.
For cases where safe and complete omission from flames are essential, field machining and cold cutting applications deliver safe, reliable results.
BlueFin’s tenure and expertise in controlled bolting and joint integrity measures and monitors bolt relaxation, gasket creep, direct load loss, friction variable reduction, and direct axial force.
Inline isolation tools advance safe construction tasks related to welder safety, pressure testing, and weld seam integrity testing.
The traditional way of isolating a flowline, is to install numerous blind and skillet flanges, as well as utilizing air movers, to clear the flowline of harmful vapors. When utilizing air movers, you aren’t always able to control where the vapors go once released to the atmosphere. Wind direction plays a major part in this process.