Gas Storage
Location: Louisiana
Well Specifications
BOP Stack: 21 1/4” 5M/10M
BOP Height: 65’(H)
BOP Weight: 185 tons
BACKGROUND
A large North American midstream company operating a gas storage facility required connection integrity management for a planned casing reroute. Due to damaged casing as a result of salt fall within the cavern, the said operator required a large Snubbing stack installation to handle the cavern pressure and capable of cutting 10 3/4” casing.
CHALLENGE
Develop a project work plan to safely commission a large BOP stack. Partner with the said leading consultant company to properly plan SIMOPS tasks on a 24-hour operation.
Scope of Work
(6) Six Connection Integrity of BOP systems
(2) Two Hydrostatic Pressure Tests
Snubbing loops and risers
Technical Achievements
Commissioned one of the largest onshore BOP stacks recorded.
Established clear chain of command and communication amongst all contractors.
Project completed on time with zero incidents.